• LinkedIn

Holland Park: 5 bed house refurbishment

Holland Park: 5 bed house refurbishment
Type of Property:5 Bed House (4-Storey)
Work Undertaken:
  • Supplied and fitted new wet room, including complete re-plumbing of bathroom to move all pipes under the floor, fitting wall to ceiling tiles, rain shower, soft-close toilet, towel rail and double vanity unit with a made-to-measure mirror above and glass shelves built into an alcove to the side
  • Supplied and fitted second new bathroom
  • Supplied and fitted new downstairs cloakroom
  • Refurbished conservatory by way of replacing some of the wooden structure and re-rendering one wall
  • Fixed the roof where it was leaking (front and rear of house)
  • Painted entire house
  • Supplied and fitted roller blinds
  • Replaced all ceiling and wall lights
  • Replaced glass in front door
  • Replaced carpets
Time Taken:9 weeks
Problems Encountered during the project:The only minor problem we encountered was with the electrics as the property had been badly rewired some time ago so replacing lights was a much bigger job than it should have been